
ATM Engineering
Maintaining spacing between aircraft: is it more effective
to depend on distance or time?
by Carine Hebraud & Eric Hoffman, Karim Zeghal (Eurocontrol),
Nayen Pene, Laurence Rognin (Steria)
Air Traffic Technology International 2005
Safety management with ISO 9000
by Françoise Girard
Air Traffic Solutions 2004
Implementation
of system integration & validation
by Chrystelle Prost, Christian Le Goer & Mathy Gonon
(STNA)
Air Traffic Solutions 2002
ATC Systems
Departures to go: a complex key task performed by Maestro
by Lionel Bernard-Peyre
Air Traffic Technology International 2005
Compliance
testing & monitoring
of the ATIS/DCL communications
by Pierre Schacre & Philippe Renaud (Eurocontrol)
Air Traffic Technology International 2004
Simulation & Training:
SCANSIM
2 is the core of the new ENAC training
centre
by Frédéric Thenevin
Airports International 2004
Simulators for safety
by Hervé Breton
Air Traffic Technology International 2003
Validation of ATC Training
by Sonia Abdesslem
Air Traffic Technology International 2002
Airport Engineering
Aircraft noise exposure assessment, a key issue in airport
operation and land use planning
by Nicolas Lamballe
Airport 2004
The management of airfield pavements:
technical assessment of aeronautical pavements
by Fabrice Breton & Christian Escoffier
Airport 2002
|